File #: 22-1822    Version: 1 Name: 12/19/22 - Change Order No. 2 for 2022 Sidewalk Repair Program (CLI)
Type: Resolution Status: Passed
File created: 12/19/2022 In control: City Council
On agenda: 12/19/2022 Final action: 12/19/2022
Enactment date: 12/19/2022 Enactment #: R-22-395
Title: Resolution to Approve Change Order No. 2 with CLI Concrete Leveling Inc. (Bid No. 4676) for the 2022 Sidewalk Repair Project ($33,670.00, Total Contract $225,270.00)
Attachments: 1. CouncilAction 2022-021 CM 1 CLI R-22-176.pdf, 2. 2022 Sidewalk Maps.pdf, 3. Contract Mod 2 Signed.pdf, 4. CLI Contract.pdf, 5. R-21-166 May 17 2021 CLI.pdf, 6. CLI Contract Extension for 2022.pdf
Title
Resolution to Approve Change Order No. 2 with CLI Concrete Leveling Inc. (Bid No. 4676) for the 2022 Sidewalk Repair Project ($33,670.00, Total Contract $225,270.00)
Memorandum
Attached for your review and approval is Change Order No. 2 to the construction contract with CLI Concrete Leveling Inc. (CLI) for concrete leveling services on the 2022 Sidewalk Repair Project.

This contract work includes leveling sidewalk slabs that have settled and hold water, have caused a displacement to adjacent slabs, or do not slope in the correct direction. Performing this lower-cost maintenance work helps to avoid the more expensive removal and replacement of otherwise good sidewalk slabs. Based on the contractor's unit prices, leveling saves the City an average of about $206 per slab over replacement.

The original estimate for the 2022 project was to level 1,300 slabs. However, a more detailed inspection to date has indicated that this amount is significantly higher. While this will result in a greater expenditure for sidewalk leveling, it will likely also result in a significant reduction in the number of slabs that require replacement.

A contract for 2021 was initially approved on May 17th, 2021 for $93,600.00 with the option to renew for 2022 with resolution R-21-166. The renewal was executed, then change order no. 1 to increase to the contract by $98,000.00 to $191,600.00 was approved on June 6, 2022 with resolution R-22-176. We have since found additional lifting is needed. This Change Order No. 2 will be the Final Contract Modification and will complete the 2022 sidewalk leveling.

Therefore, the City seeks to increase the value of this contract by $33,670.00 to a total of $225,270.00 to accomplish this work through the 2022 Sidewalk Repair Project.

Budget/Fiscal Impact: Funding for the project (TR-AT-22-02) comes from the Street, Bridge, and Sidewalk Millage, and is available in the approved capital budget.
Staff
Prepared by: Nicholas Hutchinson, P.E...