File #: 08-0209    Version: 1 Name: 040708 - Traver Traffic Calming
Type: Resolution Status: Passed
File created: 4/7/2008 In control: City Council
On agenda: 4/7/2008 Final action: 4/7/2008
Enactment date: 4/7/2008 Enactment #: R-08-123
Title: Resolution to Approve the Installation of Traffic Calming Devices on Traver Road
Title
Resolution to Approve the Installation of Traffic Calming Devices on Traver Road
Memorandum
Attached for your approval is a resolution for the installation of traffic calming devices on Traver Road (Pear to John A Woods). The construction is expected to take place in 2008 construction season by the City's contractor for the 2008 Annual Local Street Resurfacing project, and to be paid for from the approved Project Management Local Street, Traffic Calming Budget.  
 
The residents of Traver Road have been surveyed and support the attached proposed traffic calming plans for their neighborhood.  The Traver Road traffic calming project began with the residents' petition received on June 26, 2006.  After the initial evaluation and completion of the required speed study, the traffic calming public meetings were scheduled using the established process. All meetings were held on site and included walking the study street. Traver Road's meetings were held on May 22 and July 10, 2007.  
 
The adopted program allowed us to send a questionnaire to each address in the project area to determine their concerns, location of those concerns, and preferred traffic calming devices, among other information.  This information proved useful in allowing us to attend the first meeting with a draft plan based on feedback from the residents.  We walked the project limits and discussed the draft plan, making adjustments to be reviewed at the second meeting.  At the second meeting, we shared the revised draft plan, had the devices painted on the street for visual review, and walked the project limits and discussed the revised draft plan, allowing for modification as necessary.
 
The final draft plan from the second meeting was mailed to the residents in the project area.  Each household was surveyed if they support the plan as shown, or allowed to indicate device-by-device which portion or portions of the plan they supported.  The final results are as follows:
 
Traver Road
      No. Valid Addresses                                    21
      No. Homeowner Residents                                    12
      No. Survey Postcards Rec'd by Clerk's Office              9
      No. Homeowner Residents Responding                    8
      Percent Homeowner Residents Responding            66%
      No. Surveys Suppoeting Plan as Shown                    7
      Percent of Surveys Rec'd Supporting Plan as Shown      77%
      *to pass, both criteria must receive 60% or higher
 
The project passed the survey stage.  The traffic calming plan for Traver Road includes two (2) speed humps as shown in the attached final Consensus Plan. The construction of the traffic calming devices is planned for the 2008 construction season.
Staff
Prepared by:      Homayoon Pirooz, P.E., Manager, Project Management
Reviewed by:      Sue F. McCormick, Public Services Administrator
Approved by:      Roger W. Fraser, City Administrator
Body
Whereas, The residents of Traver Road petitioned for traffic calming plans on their street;
 
Whereas, the survey results support the proposed traffic calming plans;
 
Whereas, The total estimated construction cost for the traffic calming devices is $9,600; and
 
Whereas, Funding for the construction of the traffic calming projects is included in the approved FY 2008 Project Management Local Street, Traffic Calming budget;
 
RESOLVED. That City Council approve the installation of the traffic calming devices on Traver Road, and
 
RESOLVED, That the City Administrator be authorized to take the necessary administrative actions to implement this resolution.