File #: 17-0853    Version: 1 Name: 6/19/17 - South Main Water Extension
Type: Resolution Status: Passed
File created: 6/19/2017 In control: City Council
On agenda: 6/19/2017 Final action: 6/19/2017
Enactment date: 6/19/2017 Enactment #: R-17-227
Title: Resolution to Award a Contract with Carrigan Development, Inc. for the South Main Street Water Main Extension Project ($74,100.00)
Attachments: 1. Carrigan contract S Main Water.pdf
Title
Resolution to Award a Contract with Carrigan Development, Inc. for the South Main Street Water Main Extension Project ($74,100.00)

Memorandum
Attached for your review and consideration for approval is a resolution to authorize the award of a contract with Carrigan Development, Inc. in the amount of $74,100.00 for construction of replacement water main on South Main Street between the Ann Arbor Railroad and Madison Street.

A private development project located at 615 South Main Street is obligated to construct replacement water main along South Main Street from East Mosely Street to West Madison Street in order to adequately supply water to the project site. Staff identified an existing 139 foot section of 6" water main north of the Madison Street intersection currently connected to 12" water main at the Ann Arbor Railroad tracks. The developer for The Residences at 615 South Main is obligated to replace existing 6" water main from their development to the existing 12" water main on West Madison Street. In order to improve water pressure and system reliability on South Main Street, there is a need to replace the remaining 6" water main in South Main Street with new 12" water main.

The developer has contracted with Carrigan Development, Inc. to construct underground utilities for The Residences at 615 South Main. Utilizing Carrigan to perform the remaining water main work while they are mobilized to the site has been identified by staff as the most cost-effective means to complete the upsizing of the water main on South Main Street.

Staff is recommending award of a contract to Carrigan Development, Inc. in the amount of $74,100.00 for installation of 139 feet of 12" water main.

Budget Impact:
Funding is available in the approved Water Supply Fund Capital budget.

Carrigan Development is in compliance with the requirements of the City's Non-Discrimination and Living Wage ordinances.
Staff
Prepared by: Nicholas Hutchinson, City Engineer
Revie...