that:
Motion 1: The Ann Arbor City Planning Commission recommends
that the Mayor and City Council approve the 3400 Dexter Road
rezoning from TWP (Township) to R4B (Multiple Family Dwelling
District).
Motion 2: The Ann Arbor City Planning Commission recommends
approval of SP26-0021, 3400 Dexter Road Site Plan version 7 dated
June 25, 2026, subject to execution and compliance with the
development agreement and the following conditions, which must
be satisfied through the submission of revised plans within six
months of approval by the City Council:
For Engineering:
1. Sheet C6 – Site Plan: With the current submission, a sidewalk gap
will be created between 3400 Dexter Road and Ironwood Drive.
Engineering supports the establishment of a connection through
this corridor to provide adequate means of conveyance for both
future residents of this development and those of the surrounding
communities.
2. Sheet C7 - Utility Sheet:
a. The proposed storm sewer design in the Dexter-Ann Arbor Road
Right-ofWay appears to be working against the existing grades. The
City prefers not to introduce storm sewer piping in this area.
Consider revising the grading to promote positive drainage toward
the street from the front of sidewalk to the road pavement by
providing a minimum 3% slope from the front of sidewalk to the
edge of pavement to allow stormwater to sheet flow to the roadway.
Alternatively, positive drainage toward the east could be achieved
by regrading the area with a culvert and swale directing runoff east
toward the next drive approach culvert.
b. The petitioner has noted that the proposed sanitary lift station is
assumed to have a maximum depth of 17’. Provide inverts of the
proposed sanitary sewer 3-inch force main.
c. The proposed 3-inch sanitary force main appears to be located in
the center of the 30-foot wide easement. All sanitary pipe located
within a public utility easement shall be located 5 feet from the
center of the easement.
d. The existing garage located on parcel address, 647 Ironwood
Drive, shall not be located within a public utility easement. Consider
the demolition or removal of the garage or relocation of the
proposed utilities to meet this requirement.
e. Confirm if the buildings have “fire-rated” walls or true “firewalls”.