Ann Arbor logo
File #: 24-0093    Version: 1 Name: 2/20/24 - Funding Allocation for Design of the Pauline-Runnymede Path
Type: Resolution Status: Passed
File created: 2/20/2024 In control: City Council
On agenda: 2/20/2024 Final action: 2/20/2024
Enactment date: 2/20/2024 Enactment #: R-24-056
Title: Resolution to Approve the Appropriation of $140,000.00 from the General Fund Unobligated Fund Balance for the Design and Preparation of a Grant Application for the Pauline-Runnymede Path (8 Votes Required)
Title
Resolution to Approve the Appropriation of $140,000.00 from the General Fund Unobligated Fund Balance for the Design and Preparation of a Grant Application for the Pauline-Runnymede Path (8 Votes Required)
Memorandum
The Pauline-Runnymede path is an existing asphalt path that connects Pauline Boulevard to the dead-end segment of Runnymede Boulevard. The path is an important connection for the neighborhood to the south and for non-motorized access to Dicken Elementary School. The path is currently in poor condition and City staff has received many inquiries about repairing the path.

The path is located on the property of the Walden Village Condominiums and the City does not currently have an easement for the path. While Walden Village has committed funds to perform repair work on the path in 2025, the City is seeking a Transportation Alternatives Program (TAP) grant to supplement this effort. Applications for the next round of TAP grant applications a due in June of 2024. The estimated to total cost of the project is approximately $750,000.00. This planning-level cost estimate includes the replacement of the existing path with a 5-foot wide concrete path that will be compliant with the Americans with Disabilities Act (ADA).

The TAP grant application process requires at least 30% plans to be developed. Thus, Staff is requesting this funding allocation to begin the design process for the project so that the grant application can be submitted on time. Wade Trim, Inc. will be providing the engineering and grant application support for the project. The requested $140,000.00 is anticipated to cover the entire design phase.

To obtain a TAP grant, the City will also need to have control over the property on which the path sits. Staff will work with Walden Village to obtain the required easement, as well as develop an agreement for the long-term maintenance of the path.

The TAP grant will not cover the entire cost of the project and requires a local match. In ...

Click here for full text