File #: 23-0167    Version: 1 Name: 3/6/23 - City/DDA Agreement for South Main Street
Type: Resolution Status: Passed
File created: 3/6/2023 In control: City Council
On agenda: 3/6/2023 Final action: 3/6/2023
Enactment date: 3/6/2023 Enactment #: R-23-068
Title: Resolution to Approve an Agreement with the Downtown Development Authority for the South Main Street Watermain and Resurfacing Project ($119,000.00)
Attachments: 1. Agreement City-DDA South Main Street Construction.pdf, 2. Map.pdf

Title

Resolution to Approve an Agreement with the Downtown Development Authority for the South Main Street Watermain and Resurfacing Project ($119,000.00)

Memorandum

Attached for your review and approval is a resolution to authorize an agreement with the Ann Arbor Downtown Development Authority (“DDA”) to participate in construction costs for the South Main Street (Huron to William) Watermain and Resurfacing Project.

 

The South Main Street Water Main Replacement and Resurfacing Project, from E. William St. to E. Huron St. includes the following elements and (funding sources):

                     Replacement of water main and related appurtenances (Water Supply System Funds)

                     Selected stormwater system improvements (Stormwater Funds)

                     Road resurfacing, intermittent curb replacements, selected bump-out additions, sidewalk and ramp replacements, and APS-ready pedestrian signal improvements (Street, Bridge, and Sidewalk Millage Funds)

                     Sanitary sewer extension and repairs (Sanitary Sewer Funds)

                     Sanitary service to connect 353 South Main Street Project (Ann Arbor Housing Commission (AAHC) Funds)

                     Irrigation meter pits and related improvements (DDA Funds)

 

Some of the above scope items were added to the project at the request of other entities. Specifically, the irrigation meter pits and related improvements were requested by the DDA, who will fund that portion of the project.

 

The City and DDA coordinate infrastructure improvements through the Capital Improvement Plan (CIP) process. In coordination of work elements, it is an ideal time to replace irrigation services, meter pits, and irrigation connections that align with the DDA responsibilities set forth with the recent State Street Project, which began the DDA taking over the restoration and maintenance of irrigation systems. The DDA has sought to upgrade the services and connection equipment to the irrigation system that supports the tree planters on both sides of South Main Street. These upgrades will improve maintenance and winterizing of the irrigation system.

 

Budget/Fiscal Impact:  The DDA’s portion of the cost allocation for this contract is an estimated $119,000.00.

Staff

Prepared by:    Nicholas Hutchinson, P.E., City Engineer

Reviewed by:   Brian Steglitz, Public Services Area Administrator

Approved by:                        Milton Dohoney Jr., City Administrator

Body

Whereas, The City Council approved the construction contract for the South Main Street Watermain and Resurfacing Project on January 23, 2023 (R-23-026);

 

Whereas, The City and the Downtown Development Authority (“DDA”) agreed it would be beneficial to include the replacement of the irrigation systems in the project scope;

 

Whereas, The City and DDA have drafted the attached cost-sharing agreement for the construction phase of the project; and

 

Whereas, The City will pay the contractor and will invoice the DDA for its share of the construction costs as detailed in the attached Agreement;

 

RESOLVED, That City Council approve the attached Agreement with the Ann Arbor Downtown Development Authority for responsibilities and cost allocations for the construction of the South Main Street Watermain and Resurfacing Project;

 

RESOLVED, That the Mayor and City Clerk be authorized and directed to execute said agreement after approval as to form by the City Attorney and approval as to substance by the City Administrator; and

 

RESOLVED, That the City Administrator be authorized to take the necessary administrative actions to implement this resolution and to approve amendments to the agreement within the project budget.