Title: Resolution to Award a Construction Contract to E.T. Mackenzie Company for the 2020 Utility Improvements ($861,457.60)
Attachments: 1. ITB 4626 Bid Docs.pdf, 2. ITB 4626 Bid Summary.pdf, 3. ITB 4626 Location Map.pdf, 4. ITB 4626 Mackenzie Proposal.pdf, 5. FINAL 2019 Muni Contract Ann Arbor with certification 041720 (003).pdf
Title
Resolution to Award a Construction Contract to E.T. Mackenzie Company for the 2020 Utility Improvements ($861,457.60)
Memorandum
Attached for your approval is a resolution to award a construction contract to E.T. Mackenzie Company (Mackenzie), in the amount of $861,457.60, for the 2020 Utility Improvements.

Project Description

This project includes separate areas of work, which were combined into one contract for cost saving purposes. The three locations included are as follows:

* John Street - Construction of a new sewer connecting to John Street and abandonment of old rear yard sewer.
* South Blvd - Replacement of an old deteriorated 4-inch water main with a new 8-inch water main to improved water quality.
* Huron Street - Replacement a deteriorated section of storm sewer, west of First Street.

The City published plans and specifications through its procurement website and MITN.info and received four bids on May 12, 2020. Mackenzie was the lowest responsible bidder at $861,457.60, which is 14% below the Engineer's Estimate. A summary of the bids is attached.

Mackenzie submitted all required Non-Discrimination, Prevailing Wage, Living Wage, and Conflict of Interest Disclosure forms and complies with the requirements of the City's Non-Discrimination and Living Wage ordinances.

Budget/Fiscal Impact: The current Capital Improvements Plan (CIP) includes funding for the John Street Sanitary Sewer (UT-SN-20-14) and the South Boulevard Water Main (UT-WS-01-30). Per the existing agreement with the Michigan Department of Transportation (MDOT), the Huron Street Storm Sewer repair will be completed by the City's contractor and the costs will be reimbursed to the City by MDOT.
Staff
Prepared by: Nicholas Hutchinson, P.E., City Engineer
Reviewed by: Craig Hupy, Public Services Area Administrator
Approved by: Tom Crawford, Interim City Administrator
Body
Whereas, The 2020 Utility Improvements will provide more reliable water service on South Blvd; s...

Click here for full text