Ann Arbor logo
File #: 19-0509    Version: 2 Name: 4/15/19 - RFP-963 Stantec PSA Amendment No. 3
Type: Resolution Status: Passed
File created: 4/15/2019 In control: City Council
On agenda: 4/15/2019 Final action: 4/15/2019
Enactment date: 4/15/2019 Enactment #: R-19-159
Title: Resolution to Approve Amendment No. 3 to Extend the Professional Services Agreement with Stantec Consulting Michigan, Inc., for Water Treatment Professional Engineering Services ($200,000.00)
Attachments: 1. R-16-213_Legislation Details Stantec PSA.pdf, 2. R-17-080_Legislation Details A1.pdf, 3. R-17-407_A2 Legislation Details.pdf, 4. Amendment_No_3_PSA_Stantec_March 19_rev.pdf
Title
Resolution to Approve Amendment No. 3 to Extend the Professional Services Agreement with Stantec Consulting Michigan, Inc., for Water Treatment Professional Engineering Services ($200,000.00)
Memorandum
This memorandum and resolution requests approval of Amendment No. 3 to the professional services agreement for professional engineering services with Stantec Consulting Michigan, Inc. (Stantec). Council approved a professional services agreement for $200,000 through FY19 with Stantec in June 2016 as part of Resolution No. R-16-213, Amendment No. 1 in March 2017 as part of Resolution No. R-17-080 for $410,140.00, and Amendment No. 2 in November 2017 as part of Resolution R-17-407 for $200,000.00.

The City is seeking to amend the professional services agreement with Stantec to accommodate additional professional engineering service needs and extend the existing contract for an additional year, through FY20. The original task-based contract was effective FY17 through FY19. Stantec is currently supporting Public Services on numerous projects within the Water Treatment Services Unit (WTSU). As of the end of FY19, Stantec has completed Barton Turbine Overhaul investigation, bathymetric survey of Barton Pond, Ozone Chiller Replacement study/design/bid, and Geddes Dam Recoating and Repairs design. Currently, Stantec is working on the Ozone Chiller Replacement construction phase, the Barton Raw Water Pump Station Improvements and the Intake and Raw Water Main Replacement design, as well as providing miscellaneous hydroelectric dam/FERC regulatory assistance and electrical services. Stantec has demonstrated themselves to be experienced in a wide range of disciplines, responsive and cost effective in meeting those diverse needs on complex engineering tasks associated with the WTSU.

Additional professional engineering services are required to support the Water Treatment Services Unit with capital, operation, and maintenance projects at the Water Treatment Plan...

Click here for full text