Ann Arbor logo
File #: 18-1470    Version: 1 Name: 9/4/18 Emergency Repairs Broadway AAHC $200,000
Type: Resolution Status: Passed
File created: 9/4/2018 In control: City Council
On agenda: 9/4/2018 Final action: 9/4/2018
Enactment date: 9/4/2018 Enactment #: R-18-355
Title: Resolution to Amend the Budget and Appropriate Funds Not to Exceed $200,000.00 from the General Fund Balance to the Ann Arbor Housing Commission to Advance Funds for an Emergency Sewer Repair, Water and Electrical Repair, Insulation, and Restoration of 1508 Broadway Terrace (8 Votes Required)
Title
Resolution to Amend the Budget and Appropriate Funds Not to Exceed $200,000.00 from the General Fund Balance to the Ann Arbor Housing Commission to Advance Funds for an Emergency Sewer Repair, Water and Electrical Repair, Insulation, and Restoration of 1508 Broadway Terrace (8 Votes Required)
Memorandum
The Housing and Human Services Advisory Board (HHSAB) met on August 9, 2018 and reviewed an application by the Ann Arbor Housing Commission. The Board passed a resolution to recommend that City Council approve a budget adjustment to allocate $100,000.00 to the Ann Arbor Housing Commission for an Emergency Sewer Repair at Broadway from the City's Affordable Housing Fund (R-18-1433).

Broadway is a 20-unit public housing property consisting of three separate buildings. Broadway was built in 1956 and acquired by the AAHC in the 1970's. Broadway is the last property left to redevelop under the HUD RAD program. The plan is to redevelop Broadway in 2020. The buildings' physical structure, including the roofs, are in good condition, but the buildings need extensive upgrades including windows, water lines, sewer lines, insulation, fixtures, flooring, doors, and cabinets. The total development costs are expected to be between $1.5 million to $2.5 million. However, the sewer collapse necessitates an emergency sewer replacement now instead of waiting until 2020.

After receiving several calls from tenants regarding sewer back-ups, the AAHC contacted Horton's plumbing to send a camera into the sanitary sewer to see what was causing the ongoing problem. The camera revealed that most of the cast concrete sewer pipe running the 100 foot length of the 1508 building had either partially collapsed or was crumbling and about to collapse. The sewer line runs underground beneath the concrete slab floor of the first floor apartments.

The concrete floors must be cut into in order to dig out and replace the sewer line. In addition, due to the poor condition of the vertical sewer...

Click here for full text