File #: 09-0237    Version: 1 Name: 4/20/09 Iroquois and Stadium Water Main Improvements
Type: Resolution Status: Passed
File created: 4/20/2009 In control: City Council
On agenda: 4/20/2009 Final action: 4/20/2009
Enactment date: 4/20/2009 Enactment #: R-09-143
Title: Resolution to Award a Construction Contract to Dunigan Brothers, Inc. for the Stadium and Iroquois Water Main Replacement Project ($462,458.00; Bid No. ITB-3998)
Indexes: Water Main
Attachments: 1. Sta. Iroquois map.pdf, 2. Bidtab sta. iroquois.pdf
Title
Resolution to Award a Construction Contract to Dunigan Brothers, Inc. for the Stadium and Iroquois Water Main Replacement Project ($462,458.00; Bid No. ITB-3998)
Memorandum
Attached for your review and approval is a resolution to award a contract to Dunigan Brothers, Inc. in the amount of $462,458.00 for the Stadium and Iroquois Water Main Replacement Project.

The construction contract titled “Stadium and Iroquois Water Main Project” includes the installation of new 8” water mains at Iroquois Place and East Stadium Boulevard. The work includes approximately 3,350 feet of new 8” ductile iron water main to replace the existing 4” and 6” water main that serves the houses on East Stadium and Iroquois. This work will provide a more reliable water service for the neighborhood, and conform to City of Ann Arbor water main and fire protection standards by upsizing the pipe, and adding four new fire hydrants. As part of this construction contract, the street will be resurfaced, and adjacent sidewalk ramps will be replaced to comply with the ADA requirements.

The project was advertised on Bidnet and plans and specifications were distributed to contractors who expressed interest in the project. Ten bids for the construction were received and opened on Friday, March 13, 2009. The lowest responsible bid from Dunigan Brothers, Inc. of $462,458.00 is approximately 17% below the Engineer’s Estimate. The price of ductile iron pipe has decreased in the last year, resulting in a lower price than anticipated. The construction of the project is scheduled for completion by September 2009.

The funding for this project will be advanced from the Water Supply System pending the sale of Water Revenue bonds.

The project budget is as follows:
Design $ 68,500.00
Construction Contract $465,000.00
Construction Contingency $ 46,500.00
Testing $ 24,000.00
User Fees $ ...