Ann Arbor logo
File #: 09-0238    Version: 1 Name: 4/20/09 S. Ashley, S. Main & Londonderry Water Main
Type: Resolution Status: Passed
File created: 4/20/2009 In control: City Council
On agenda: 4/20/2009 Final action: 4/20/2009
Enactment date: 4/20/2009 Enactment #: R-09-142
Title: Resolution to Award a Construction Contract to Bricco Excavating Company, L.L.C. ($482,069.50; Bid No. ITB-3992) for the S. Ashley, S. Main & Londonderry Water Main Project
Indexes: Water Main
Attachments: 1. Bid tab.pdf, 2. location map.pdf
Title
Resolution to Award a Construction Contract to Bricco Excavating Company, L.L.C. ($482,069.50; Bid No. ITB-3992) for the S. Ashley, S. Main & Londonderry Water Main Project
Memorandum
Attached for your review and approval is a resolution to award a contract to Bricco Excavating Company, L.L.C. in the amount of $482,069.50 for the S. Ashley, S. Main & Londonderry Water Main Project.

The construction contract titled “S. Ashley, S. Main & Londonderry Water Main Projects” includes the installation of new 8” & 12” water main replacements at three different locations in the City: S. Ashley, S. Main & Londonderry. It also includes new storm sewer at Londonderry Road and Riverview Drive. The work at these locations is combined in one construction contract for efficiency and cost savings.

The S. Ashley and S. Main water main work includes the installation of approximately 240 feet of new 8” HDPE water main on S. Ashley, and 230 feet of new 12” HDPE water main on S. Main to replace the existing 6” water main that currently goes under the Ann Arbor Railroad tracks. This section of pipe has a history of water main breaks that have disrupted service. This work will provide a more reliable water service for the neighborhood, and conform to City of Ann Arbor water main and fire protection standards by upsizing the pipe and adding a fire hydrant. Adjacent sidewalk ramps will be replaced to comply with the ADA requirements.

The Londonderry Road work includes the installation of approximately 410 feet of new 8” ductile iron water main to replace an existing 6” water main to serve houses on Londonderry. This work will provide a more reliable water service for the neighborhood, and conform to City of Ann Arbor water main and fire protection standards by providing a looped main, and adding two fire hydrants. It also includes 450 feet of new storm sewer to connect two unconnected sections of storm sewer.

The Riverview Road work includes the installation of approxim...

Click here for full text