File #: 18-0742    Version: 1 Name: 6/4/18 - Contract Amendment #2 with DSD Engineering
Type: Resolution Status: Passed
File created: 6/4/2018 In control: City Council
On agenda: 6/4/2018 Final action: 6/4/2018
Enactment date: 6/4/2018 Enactment #: R-18-205
Title: Resolution to Approve Amendment #2 to the Professional Services Agreement between the City and DiClemente Siegel Design Inc. for Work Related to the Fire Station #1 Generator Replacement Project ($2,250.00)
Attachments: 1. DSD Contract - FS#1 Generator.pdf, 2. DSD Contract Amendment #1.pdf, 3. DSD Contract Amendment #2.pdf
Title
Resolution to Approve Amendment #2 to the Professional Services Agreement between the City and DiClemente Siegel Design Inc. for Work Related to the Fire Station #1 Generator Replacement Project ($2,250.00)
Memorandum
Attached for your review and approval is Amendment #2 to the April 27, 2017 Professional Services Agreement between the City and DiClemente Siegel Design Inc. Amendment #2 adds $2,250.00 to the contract and covers additional structural redesign work for the proposed relocation of the emergency generator to the roof of the building. The original Professional Services Agreement of $44,800.00 was approved by City Council on April 3, 2017 and Amendment #1 to that Agreement for $6,700.00 was approved by City Council on September 18, 2017.

The additional engineering work on the project is necessary because of the generator being heavier than the original design load. In addition, the rooftop placement of the generator was shifted to the north to address noise concerns from the Washtenaw County dispatch operations located in the Fire Station.

Funding for Amendment #2 is available in the Fire Station #1 Generator Replacement project in the approved General Fund Capital Budget.

DiClemente Siegel Design Inc. complies with the requirements of the City's Living Wage and Non-Discrimination Ordinances.
Staff
Prepared by: Matthew J. Kulhanek, Fleet & Facilities Unit Manager
Reviewed by: Craig Hupy, Public Services Area Administrator
Approved by: Howard S. Lazarus, City Administrator
Body
Whereas, The City entered into a Professional Services Agreement dated April 27, 2017 with DiClemente Siegel Design Inc. to complete engineering work for the Fire Station #1 Generator Replacement project;

Whereas, The scope and duration of the original project has necessarily changed and an amendment to add $2,250.00 to the Agreement is necessary;

Whereas, Funding for this amendment is available in the Fire Station #1 Generator Replacement project in the ...