File #: 17-0557    Version: 1 Name: 4/17/17 - Regional Detention Basin Easement
Type: Resolution Status: Passed
File created: 4/17/2017 In control: City Council
On agenda: 4/17/2017 Final action: 4/17/2017
Enactment date: 4/17/2017 Enactment #: R-17-119
Title: Resolution to Approve an Easement Agreement for the Regional Detention Basin at 2250 Ann Arbor-Saline Road ($230,000.00) (8 Votes Required)
Sponsors: Christopher Taylor
Attachments: 1. 2250 Ann Arbor-Saline Road Site Plan.pdf
Title
Resolution to Approve an Easement Agreement for the Regional Detention Basin at 2250 Ann Arbor-Saline Road ($230,000.00) (8 Votes Required)
Memo
Attached for your review and approval is a resolution to enter into an easement with the owner of 2250 Ann Arbor-Saline Road for the regional detention basin that is a requirement of the conditional zoning for the site, as well as the approved site plan and development agreement.

Council approved the conditional zoning and site plan for 2250 Ann Arbor-Saline Road on December 5, 2016. The conditional zoning requires that the owner enter into an easement agreement with the City that grants the City the right to use 72% (112,933 cubic feet) of the total capacity of the stormwater management system on-site for a regional detention basin to provide storm water detention for the surrounding area. The extra capacity in the detention basin that is being provided on this property will provide an additional stormwater management opportunity that will benefit the surrounding area. The detention basin will absorb additional stormwater from off-site and release it over time into the City's stormwater system to help minimize overland water flow into downstream neighborhoods. The City's FY2018-2023 Capital Improvement Plan has identified the need for a regional stormwater detention basin in this area.

The required terms of the easement are in the approved 2250 Ann Arbor-Saline Road Development Agreement and the 2250 Ann Arbor-Saline Road Conditional
Zoning Statement of Conditions, including the following:

* The City shall pay the owner $170,000.00 for the easement, which will include the detention basin, outlet control structure and outlet pipe.
* The City shall also reimburse the owner for 72% of the construction costs for the detention basin, up to a maximum of $60,000.00.
* The easement shall allow the City to construct the detention basin at any time and charge the owner for 28% of the construction costs in the event t...