Skip to main content
Ann Arbor logo
File #: 25-2090    Version: 1 Name: 315 W Huron Street Pre-PUD Conference (301, 311, 315, 317, 319 West Huron Street and 102, 106 South First Street)
Type: Report or Communication Status: Introduced from Staff
File created: 11/24/2025 In control: City Planning Commission
On agenda: 12/2/2025 Final action:
Enactment date: Enactment #:
Title: 315 West Huron Street Pre-PUD Conference (301, 311, 315, 317, 319 West Huron Street and 102, 106 South First Street) - A proposed PUD plan for the construction of a fully electric, 10-story mixed-use development that features approximately 280 units, a coffee shop/retail space, and amenity spaces. The ground floor is mostly comprised of covered parking, including EV charging, with access from Washington. The first floor will have additional covered parking, and coffee/retail space with access from first street. Floors 1-10 will contain a mixture of studio, one & two bedrooms, with 15% of the units being 60% AMI affordable housing. The project intends to avoid building in the floodway fringe, provide setbacks from the Almendinger building, and provide a public open space including a small park and a possible link for the Treeline Trail. The site is partially located in a floodplain fringe and zoned D2 Downtown Interface, First Street Overlay District, Secondary Street Designation, and i...
Attachments: 1. 2025-12-02_CPC 315 W Huron Staff Memo v1.pdf, 2. 2025-12-02_CPC 315 W Huron - PUD Pre-Submittal Application.pdf, 3. 2025-12-02_CPC 315 W Huron - PUD Statement of Intent.pdf, 4. 2025-12-02_CPC 315 W Huron - Conceptual PUD Site Plan.pdf, 5. 2025-12-02_CPC 315 W Huron - Comparison Chart.pdf, 6. 315 W Huron - Pre PUD.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Title
315 West Huron Street Pre-PUD Conference (301, 311, 315, 317, 319 West Huron Street and 102, 106 South First Street) - A proposed PUD plan for the construction of a fully electric, 10-story mixed-use development that features approximately 280 units, a coffee shop/retail space, and amenity spaces. The ground floor is mostly comprised of covered parking, including EV charging, with access from Washington. The first floor will have additional covered parking, and coffee/retail space with access from first street. Floors 1-10 will contain a mixture of studio, one & two bedrooms, with 15% of the units being 60% AMI affordable housing. The project intends to avoid building in the floodway fringe, provide setbacks from the Almendinger building, and provide a public open space including a small park and a possible link for the Treeline Trail. The site is partially located in a floodplain fringe and zoned D2 Downtown Interface, First Street Overlay District, Secondary Street Designation, and is in Ward 5.