File #: 18-0022    Version: 1 Name: 3/19/18 - Agreement with Level 3 Communications, LLC for the Allen Creek Railroad Berm Opening Project
Type: Resolution Status: Passed
File created: 3/19/2018 In control: City Council
On agenda: 3/19/2018 Final action: 3/19/2018
Enactment date: 3/19/2018 Enactment #: R-18-099
Title: Resolution to Approve an Agreement with Level 3 Communications, LLC (Level 3) for up to $118,200.00 for Relocation of Fiber Optic Lines for the Allen Creek Railroad Berm Opening Project
Attachments: 1. Executed Agreement.pdf
Title
Resolution to Approve an Agreement with Level 3 Communications, LLC (Level 3) for up to $118,200.00 for Relocation of Fiber Optic Lines for the Allen Creek Railroad Berm Opening Project
Memorandum
Attached for your review and consideration for approval is a resolution authorizing an agreement with Level 3 Communications, LLC (Level 3) for up to $118,200.00 for the relocation of fiber optic lines for the Allen Creek Railroad Berm Opening Project. This agreement includes an advance payment of $107,390.76, reflecting estimated relocation costs. This resolution also authorizes a recommended contingency of up to $10,809.24. The City will only be responsible for actual costs and any funds remaining will be returned to the City.

In December of 2013, the City and its consultant, OHM Advisors, completed a feasibility study to determine if it was possible to create openings in the railroad berm to accommodate passage of floodwaters, as well as to allow pedestrians to cross safely under the railroad to get to the park facilities to the north. The feasibility study indicated that it would be possible to lower the floodplain elevation in the area by as much as 6.5 feet as well as accommodate non-motorized access under the railroad.

The project aims at creating a new pedestrian connection linking downtown Ann Arbor and its neighborhoods with the Border to Border (B2B)/Iron Belle Trail through the railroad berm in the vicinity of Allen Creek. Pedestrian access is acceptable to the Michigan Department of Transportation (MDOT), who is the owner of the railroad.

On June 27, 2016, the Michigan State Police-Emergency Management Division (MSP-EM) provided City Staff with a FEMA Hazard Mitigation Assistance Grant agreement for the first phase of a two phase project to construct stormwater culverts in the railroad berm. Phase one consisted of the engineering design, development of construction plans, and preparation of the phase two hazard mitigation grant application.

O...