File #: 23-2110    Version: Name: 1/23/2023 - Iron Water Service Replacement
Type: Resolution Status: Passed
File created: 1/22/2024 In control: City Council
On agenda: 1/22/2024 Final action: 1/22/2024
Enactment date: 1/22/2024 Enactment #: R-24-028
Title: Resolution to Award Construction Contracts for Galvanized Water Service Line Replacements to All Seasons Underground Construction Inc (Not-to-Exceed $1,117,640.00 per year) and D'Angelo Bros., Inc. (Not-to-Exceed $1,117,640.00 per year) for Two Years (ITB No. 4740)
Attachments: 1. ITB_4740_Document.pdf, 2. ITB_4740_Addendum1.pdf, 3. All_Seasons_Undergoround_Construction_Bid.pdf, 4. DAngelo_Brothers_BID.pdf, 5. Copy of Iron Service Bid Tab.pdf, 6. D'Angelo Brothers Inc Contract Draft.pdf, 7. All Seasons Underground Contract Draft.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Title
Resolution to Award Construction Contracts for Galvanized Water Service Line Replacements to All Seasons Underground Construction Inc (Not-to-Exceed $1,117,640.00 per year) and D'Angelo Bros., Inc. (Not-to-Exceed $1,117,640.00 per year) for Two Years (ITB No. 4740)
Memorandum
Attached for your approval is a resolution authorizing a construction contract with All Seasons Underground Construction Inc and D'Angelo Bros., Inc. for galvanized water service line replacements for two (2) years with the option to renew for one (1) additional year.

Most water service lines installed in Ann Arbor before 1928 and some services installed during World War II (1942-1945) were made of galvanized iron and connected to the water main with a short piece of flexible lead pipe, known as a "gooseneck". The City has removed and replaced the publicly owned portion of all known galvanized water service lines and lead goosenecks. In June of 2018, an updated Lead and Copper Rule was adopted by the State of Michigan. The rule requires that water suppliers replace both the publicly owned and privately owned portions of galvanized service lines that are or were connected to lead. Water suppliers must replace these lines at a rate of 5% per year. Additionally, the rule also prohibits partial replacements, which includes repairs to leaking service lines. The City does not have the resources to complete this work in-house and so a contract for the work is needed to ensure swift response to leaking service lines and to meet the annual replacement rate.

ITB No. 4740, Galvanized Water Service Line Replacement, was advertised on the City's Website and on the Bidnet website. Four (4) bids were received and publicly opened on November 29, 2023. All Seasons Underground Construction Inc and D'Angelo Bros., Inc. were determined to be responsible bidders.

All Seasons Underground Construction Inc and D'Angelo Bros., Inc. submitted all required Responsible Contractor Criteria, Non-Discriminati...