Skip to main content
Ann Arbor logo
File #: 25-1519    Version: 1 Name: 9/2/25 AA Marathon 2025
Type: Resolution Status: Passed
File created: 9/2/2025 In control: City Council
On agenda: 9/2/2025 Final action: 9/2/2025
Enactment date: 9/2/2025 Enactment #: R-25-325
Title: Resolution to Approve Street Closings for the Ann Arbor Marathon Running Event - Sunday, October 12, 2025
Attachments: 1. A2M PROPOSED COURSE MAP.pdf

Title

Resolution to Approve Street Closings for the Ann Arbor Marathon Running Event - Sunday, October 12, 2025

Memorandum

Attached for your consideration is a resolution to approve the closing of certain streets for the Ann Arbor Marathon Running Event on Sunday, October 12, 2025 from 3:00 A.M. to 1:00 P.M.

 

The applicant, Epic Races, LLC, is raising money through this event for select charities with the common mission to "E-Race the Stigma" surrounding mental health: Families Against Narcotics, Miles Jeffrey Roberts Foundation, Girls on the Run, Lost Voices, and Concert Music Outreach Collective.

 

The applicant has requested to close the following route between 3:00 A.M. and 1:00 P.M. and the streets will be reopened as soon as safely possible after participants have cleared the areas (many of these streets will occupy one lane only). The races start at 7:00 AM:

 

                     Start on ASHLEY heading SOUTH

                     LEFT on LIBERTY

                     RIGHT on STATE

                     LEFT on SOUTH UNIVERSITY

                     LEFT on PEDESTRIAN MALL (Sidewalk)

                     Follow along and cross NORTH UNIVERSITY

                     Take the path to the right of the Biological Sciences building and head straight to the CCRB bridge.

                     Make your way across the bridge, along the path until you come to OBSERVATORY ST. TURN RIGHT on OBSERVATORY. LEFT on GEDDES

                     SLIGHT RIGHT to stay on GEDDES

                     DO NOT TURN LEFT INTO ARBORETUM - 10K ONLY

                     LEFT on HURON PARKWAY

                     LEFT on E. HURON RIVER DRIVE

                     LOOP LEFT on DIXBORO (NOT OLD DIXBORO)

                     LEFT turn (before the light at Geddes) to go down to the DIXBORO DAM

                     LEFT on GALLUP PARK PATHWAY

                     STAY ON GALLUP PARK PATHWAY FOR .64 miles, all the way to PARKER MILL

                     STAY RIGHT at the fork in the path to continue under GEDDES ROAD

                     STAY ON PATH straight through to DIXBORO ROAD

                     CROSS DIXBORO ROAD

                     CROSS GEDDES ROAD and jump on sidewalk (stay on sidewalk)

                     Sidewalk ends after Concordia College, continue onto GEDDES ROAD (stay left)

                     CROSS HURON PARKWAY move to the sidewalk on the right side of FULLER RD.

                     At traffic light, slight left to CROSS FULLER RD to FULLER CT

                     LEFT to get back on FULLER RD.

                     LEFT on E. MEDICAL CENTER DR.

                     LEFT into MEDICAL CENTER PARKING LOT

                     ENTER ARBORETUM

                     RIGHT at SOS box by tables across from river

                     UP the hill, bearing right (do not go on stairs)

                     EXIT ARBORETUM on WASHINGTON HEIGHTS

                     LEFT on OBSERVATORY

                     RIGHT on SIDEWALK across CCRB BRIDGE

                     Follow along and cross NORTH UNIVERSITY

                     LEFT on PEDESTRIAN MALL (Sidewalk)

                     RIGHT on SOUTH UNIVERSITY

                     RIGHT on STATE

                     LEFT on LIBERTY

 

One month before the event, the applicant will hand-deliver information about the event to all impacted businesses and notify the media. One week before the event, the applicant will post informational signs along the route and send postcards to impacted residents along the Geddes.  The City’s website will also include information about street closures for this event. 

 

The applicant agrees to obtain all necessary permits, to provide evidence of proper liability insurance as required, to comply with all City regulations governing the use of the streets, and will reimburse the City for all event expenses.

 

City staff met with the organizers for this event in 2024 as there were complaints received in 2023 regarding traffic back-ups and congestion, access to businesses, and, most importantly, the length of time that streets were closed.  The organizer is asking for what amounts to a 10-hour street closure for major streets.  This disruption was particularly felt by City Police, who bore the brunt of the complaints during the event.  Recognizing that as the race nears its end the participants will be directed to sidewalks, which should allow the streets to open sooner, but because of the full length of time, the disruption is still significant.  Additionally, the City Administrator received feedback in advance of the 2024 event decrying the route and disruption to the downtown community for such a great length of time.  Aside from the Main Street Area Association (MSAA), there was not much negative feedback for 2024.  The Applicant will work closely with MSAA to ensure barricades are replaced properly.

Staff

Prepared by:                     Debra Williams, Office Manager

Reviewed by:                     Derek Delacourt, Community Services Area Administrator

Approved by:                     Milton Dohoney Jr., City Administrator

Body

Whereas, The City has received a request to approve the closing of certain streets for the Ann Arbor Marathon Running Event on Sunday, October 12, 2025 from 3:00 A.M. to 1:00 P.M.;

 

Whereas, The Applicant is requesting the City close the following route from 3:00 A.M. to 1:00 P.M. for the race and cleanup with streets to reopen as soon as safely possible after participants have cleared the areas:

 

                     Start on ASHLEY heading SOUTH

                     LEFT on LIBERTY

                     RIGHT on STATE

                     LEFT on SOUTH UNIVERSITY

                     LEFT on PEDESTRIAN MALL (Sidewalk)

                     Follow along and cross NORTH UNIVERSITY

                     Take the path to the right of the Biological Sciences building and head straight to the CCRB bridge.

                     Make your way across the bridge, along the path until you come to OBSERVATORY ST. TURN RIGHT on OBSERVATORY. LEFT on GEDDES

                     SLIGHT RIGHT to stay on GEDDES

                     DO NOT TURN LEFT INTO ARBORETUM - 10K ONLY

                     LEFT on HURON PARKWAY

                     LEFT on E. HURON RIVER DRIVE

                     LOOP LEFT on DIXBORO (NOT OLD DIXBORO)

                     LEFT turn (before the light at Geddes) to go down to the DIXBORO DAM

                     LEFT on GALLUP PARK PATHWAY

                     STAY ON GALLUP PARK PATHWAY FOR .64 miles, all the way to PARKER MILL

                     STAY RIGHT at the fork in the path to continue under GEDDES ROAD

                     STAY ON PATH straight through to DIXBORO ROAD

                     CROSS DIXBORO ROAD

                     CROSS GEDDES ROAD and jump on sidewalk (stay on sidewalk)

                     Sidewalk ends after Concordia College, continue onto GEDDES ROAD (stay left)

                     CROSS HURON PARKWAY move to the sidewalk on the right side of FULLER RD.

                     At traffic light, slight left to CROSS FULLER RD to FULLER CT

                     LEFT to get back on FULLER RD.

                     LEFT on E. MEDICAL CENTER DR.

                     LEFT into MEDICAL CENTER PARKING LOT

                     ENTER ARBORETUM

                     RIGHT at SOS box by tables across from river

                     UP the hill, bearing right (do not go on stairs)

                     EXIT ARBORETUM on WASHINGTON HEIGHTS

                     LEFT on OBSERVATORY

                     RIGHT on SIDEWALK across CCRB BRIDGE

                     Follow along and cross NORTH UNIVERSITY

                     LEFT on PEDESTRIAN MALL (Sidewalk)

                     RIGHT on SOUTH UNIVERSITY

                     RIGHT on STATE

                     LEFT on LIBERTY

 

Whereas, The street closures will be signed, barricaded and properly supervised;

 

Whereas, The Applicant agrees to obtain all necessary permits, to provide evidence of proper liability insurance as required, and to comply with all City regulations governing the use of the streets;

 

Whereas, The Applicant has agreed to pay the cost of City services associated with the staging of this event; and

 

Whereas, Notification of the street closings will be provided through the City’s website, GovDelivery and the applicant’s communications;

 

RESOLVED, That the Applicant will pay the cost of City services associated with the staging of this event; and

 

RESOLVED, That City Council approve the closing of the following route on Sunday, October 12, 2025 from 3:00 A.M. to 1:00 P.M. with streets to reopen as soon as safely possible after participants have cleared the areas:

 

                     Start on ASHLEY heading SOUTH

                     LEFT on LIBERTY

                     RIGHT on STATE

                     LEFT on SOUTH UNIVERSITY

                     LEFT on PEDESTRIAN MALL (Sidewalk)

                     Follow along and cross NORTH UNIVERSITY

                     Take the path to the right of the Biological Sciences building and head straight to the CCRB bridge.

                     Make your way across the bridge, along the path until you come to OBSERVATORY ST. TURN RIGHT on OBSERVATORY. LEFT on GEDDES

                     SLIGHT RIGHT to stay on GEDDES

                     DO NOT TURN LEFT INTO ARBORETUM - 10K ONLY

                     LEFT on HURON PARKWAY

                     LEFT on E. HURON RIVER DRIVE

                     LOOP LEFT on DIXBORO (NOT OLD DIXBORO)

                     LEFT turn (before the light at Geddes) to go down to the DIXBORO DAM

                     LEFT on GALLUP PARK PATHWAY

                     STAY ON GALLUP PARK PATHWAY FOR .64 miles, all the way to PARKER MILL

                     STAY RIGHT at the fork in the path to continue under GEDDES ROAD

                     STAY ON PATH straight through to DIXBORO ROAD

                     CROSS DIXBORO ROAD

                     CROSS GEDDES ROAD and jump on sidewalk (stay on sidewalk)

                     Sidewalk ends after Concordia College, continue onto GEDDES ROAD (stay left)

                     CROSS HURON PARKWAY move to the sidewalk on the right side of FULLER RD.

                     At traffic light, slight left to CROSS FULLER RD to FULLER CT

                     LEFT to get back on FULLER RD.

                     LEFT on E. MEDICAL CENTER DR.

                     LEFT into MEDICAL CENTER PARKING LOT

                     ENTER ARBORETUM

                     RIGHT at SOS box by tables across from river

                     UP the hill, bearing right (do not go on stairs)

                     EXIT ARBORETUM on WASHINGTON HEIGHTS

                     LEFT on OBSERVATORY

                     RIGHT on SIDEWALK across CCRB BRIDGE

                     Follow along and cross NORTH UNIVERSITY

                     LEFT on PEDESTRIAN MALL (Sidewalk)

                     RIGHT on SOUTH UNIVERSITY

                     RIGHT on STATE

                     LEFT on LIBERTY