File #: 26-0473    Version: 1 Name: 4/20/26 - 2026 Sidewalk Cutting Contract Renewal
Type: Resolution Status: Passed
File created: 4/20/2026 In control: City Council
On agenda: 4/20/2026 Final action: 4/20/2026
Enactment date: 4/20/2026 Enactment #: R-26-136
Title: Resolution to Approve a Construction Contract Renewal with Precision Concrete, Inc. for the Annual Sidewalk Repair Program ($283,908.00)
Attachments: 1. 2026 Inspection Areas.pdf, 2. 2026 PCC Contract Renewal.pdf

Title

Resolution to Approve a Construction Contract Renewal with Precision Concrete, Inc. for the Annual Sidewalk Repair Program ($283,908.00)

Memorandum

Attached for your consideration is a resolution to approve the renewal of a construction contract with Precision Concrete, Inc., in the amount of $283,908.00 for the repair and maintenance of the City’s sidewalk system. This is one of two contracts that will be renewed for the 2026 Sidewalk Repair Program, one each for replacements and trimming of sidewalk slabs.

 

Background

Engineering staff solicited proposals for the Annual Sidewalk Repair Program through the City’s Procurement Unit and received proposals on February 14, 2024.

 

RFP 24-07 included language that, if both the City and awarded Contractor agree, the contract may be renewed for two additional one-year periods, subject to the availability of funding, with unit pricing remaining the same as the original 2024 contract. The first of two renewals was used to perform sidewalk cutting repairs in 2025. Updates to the 2026 renewal were identified to include revisions to the estimated quantities, completion dates, and contract total.

 

The original construction contract with Precision Concrete, Inc. (RFP 24-07) received Council approval on March 18, 2024 (R-24-087; File #: 24-0199).

 

Both parties agree to the original terms outlined in the 2024 contract and are therefore moving forward with renewing the contract for 2026.

 

2026 Sidewalk Cutting Repair Program

The 2026 Sidewalk Cutting Repair Program consists of horizontally cutting existing concrete sidewalk slabs that have vertical displacements in approximately 20% of the City in 2026, as part of the 5-year Sidewalk Repair Program cycle to annually perform repair and maintenance of the City’s sidewalk system. The attached maps depict the 2026 designated areas.

 

This is a unit price contract with the understanding that the actual quantities will vary based on assessment of the sidewalks this spring. The construction is scheduled to begin in April 2026 and continue through November 2026.

 

Precision Concrete, Inc. complies with the requirements of the City’s Non-Discrimination, Prevailing Wage and Living Wage ordinances.

 

Budget/Fiscal Impact:  The estimated total cost for the 2026 Sidewalk Repair Program (TR-AT-22-06) is $1,122,000.00. The project will have no additional operational impacts.

 

Revenue Source

Amount

Street, Bridge, and Sidewalk Millage Fund

$1,007,000.00

Act 51 Major Streets Fund

$60,000.00

Act 51 Local Streets Fund

$55,000.00

Total

$1,122,000.00

 

Staff

Prepared by:                     Nicholas Hutchinson, P.E., City Engineer

Reviewed by: Jordan Roberts, Public Services Area Administrator

Approved by: Milton Dohoney Jr., City Administrator

Body

Whereas, The City of Ann Arbor’s Adopted FY 2026 Capital Budget includes the Annual Sidewalk Repair Program;

 

Whereas, The 2026 Sidewalk Repair Program includes the repair of vertically displaced sidewalks in approximately 20% of the City;

 

Whereas, The original construction contract with Precision Concrete, Inc. (RFP 24-07) received council approval on March 18, 2024 (R-24-087; File #: 24-0199);

 

Whereas, It is desirable to enter a second, and final, one-year contract renewal with Precision Concrete, Inc. to maintain existing unit pricing;

 

Whereas, The contract sets forth, among other things, the services to be performed by Precision Concrete, Inc., and the payments to be made by the City therefore, all of which are agreeable to the City; and

 

Whereas, Precision Concrete, Inc. complies with the City of Ann Arbor Non-Discrimination and Living Wage Ordinances;

 

RESOLVED, That City Council approve a one-year renewal to the construction contract with Precision Concrete, Inc. in the amount of $283,908.00 for the 2026 Sidewalk Repair Program;

 

RESOLVED, That a contingency amount of $28,000.00 be established within the project budget and that the City Administrator be authorized to approve additional change orders to the construction contract with Precision Concrete, Inc. not to exceed $28,000.00 in order to satisfactorily complete this project; and

 

RESOLVED, That the City Administrator be authorized to take necessary administrative actions to implement this resolution including approval of needed Traffic Control Orders, night work authorizations, and other similar administrative approvals to allow the work of the project to proceed without delay.