File #: 10-0459    Version: 1 Name: 6/7/10 - VNYCHA Water Main Replacement
Type: Resolution Status: Passed
File created: 5/6/2010 In control: City Council
On agenda: 6/7/2010 Final action: 6/7/2010
Enactment date: 6/7/2010 Enactment #: R-10-180
Title: Resolution to Award Contract to Site Development, Inc. ($720,387.20; Bid No. ITB-4082) for the Vaughn St./ Nob Hill/ Copley Ave./ Harbal/Leaird Dr./ Yost Alley Water Main and First Street Sanitary Replacement Project
Indexes: Water Main
Attachments: 1. 2010021 VNYCHA location map.pdf, 2. VNYCHA Bid Tabulation.pdf
Title
Resolution to Award Contract to Site Development, Inc. ($720,387.20; Bid No. ITB-4082) for the Vaughn St./ Nob Hill/ Copley Ave./ Harbal/Leaird Dr./ Yost Alley Water Main and First Street Sanitary Replacement Project
Memorandum
Attached for your review and approval is a resolution to award a contract to Site Development, Inc. in the amount of $720,387.20 for the Vaughn St./ Nob Hill/ Copley Ave./ Harbal/Leaird Dr./ Yost Alley Water Main And First Street Sanitary Replacement Project.

The construction contract titled “Vaughn St. / Nob Hill/ Copley Ave. / Harbal & Leaird Dr. / Yost Alley Water Main and First Street Sanitary Replacement Project” includes the installation of new 8” and 12” water mains at several different locations in the City. The locations are combined in one construction contract for efficiency and cost savings.

The Vaughn Street water main includes the installation of approximately 690 feet of new 8” ductile iron water main to replace the existing 4” water main that serves the houses on Vaughn Street. The fire hydrants on Vaughn Street have inadequate flows. This work will provide a more reliable water service for the neighborhood, and conform to City of Ann Arbor water main and fire protection standards by upsizing the pipe. Vaughn Street is scheduled to be resurfaced by the city resurfacing project this year, following the water main work, which will also replace adjacent sidewalk ramps to comply with ADA requirements.

The Nob Hill water main includes the installation of approximately 2,663 feet of new 8” and 12” ductile iron water main to replace the existing 6” mains that serve the apartment houses on Nob Hill, and the houses on South First Street and West Davis Ave. Nob Hill and South First Street have a history of water main breaks that have disrupted service. The water main replacement will extend north to Madison in order to improve fire flows appropriate for a high density residential population. This work will provide a m...