Ann Arbor logo
File #: 10-0094    Version: 1 Name: 030110 - CDM Amendment for Swift Run Sanitary - 2010 March
Type: Resolution Status: Passed
File created: 3/1/2010 In control: City Council
On agenda: 3/1/2010 Final action: 3/1/2010
Enactment date: 3/1/2010 Enactment #: R-10-048
Title: Resolution to Amend the Professional Services Agreement with CDM Michigan, Inc. for the Swift Run Parallel Relief Sewer Project ($49,285.00)
Title
Resolution to Amend the Professional Services Agreement with CDM Michigan, Inc. for the Swift Run Parallel Relief Sewer Project ($49,285.00)
Memorandum
This is to recommend approval of the attached resolution authorizing an amendment to the Professional Services Agreement with CDM Michigan, Inc. (CDM) for design and construction engineering services performed for the Swift Run Parallel Relief Sewer. CDM’s services are now complete and this amendment authorizes payment for additional costs associated with engineering services required as detailed below.

Project Background
The project consisted of constructing a 27” diameter parallel relief sewer to the Swift Run Sanitary Trunk Sewer to provide capacity for peak and predicted future flows. During wet weather, overflows had occurred in the trunkline. This parallel sewer was constructed in Pittsfield and Ann Arbor Townships. Construction of this improvement was required by MDEQ under the terms of the Administrative Consent Order to address sanitary sewer overflows.

Design Contract
In November 2000, the contract for design of the improvements was awarded to CDM Michigan, Inc. However, due to ongoing conversations between the City and Shetland Drive residents regarding Outside City Service Agreements for sewer service, the project was put on hold and CDM’s purchase order was closed. The issues were later resolved and in March 2006, CDM’s contract was reopened and amended to include easement-related work (R-101-3-06). In August 2008, CDM’s agreement was amended a second time to include construction engineering, inspection, and staking of construction.

Proposed Amendment 3
The proposed amendment will allow payment of work completed by CDM which was in addition to the previously approved contract scope. CDM provided additional work for the following tasks:

· Permit Support and Drawing Revisions
· Additional Survey Activities
· Additional Construction Inspection

As described in a separate memorandum ...