Ann Arbor logo
File #: 09-1265    Version: 2 Name: 2/16/10 Annual Survey of Traffic Calming 07-08
Type: Report or Communication Status: Filed
File created: 2/16/2010 In control: City Council
On agenda: 2/16/2010 Final action: 2/16/2010
Enactment date: Enactment #:
Title: Annual Survey of Traffic Calming Projects Constructed in 2007 and 2008
Attachments: 1. Attachment A
Title
Annual Survey of Traffic Calming Projects Constructed in 2007 and 2008
Memorandum
It has been one year or more after construction of traffic calming projects for Traver Road and Starwick Drive.  Following the review of the post construction traffic speeds and the feedback form the affected residents, the 2007 and 2008 traffic calming projects have been successful in meeting their objectives; reducing speeds and satisfying the street's residents.
 
The Starwick Drive Traffic Calming project, between Pontiac and Barton,  consisted of three (3) speed humps and one (1) partial neckdown. It was constructed in the summer/ fall of 2007 and had a lengthy delay in getting post construction speed data collected.  The Traver Road project, Pear to John A Woods consisted of the installation of two (2) speed humps in the summer of 2008.
 
For Starwick Drive the 85th percentile speed was 34 mph before the traffic calming project and the post construction survey showed an 85th percentile speed of 20 mph. Similarly improvement was seen on Traver Road with a pre construction 85th percentile speed of 31 mph and a post construction speed of 25 mph.
 
In addition to the speed study above, we surveyed the residents in the area of the projects to learn about the residents' level of satisfaction with the traffic calming improvements.  The survey post cards asked if the residents were satisfied with the traffic calming devices installed on their street, and provided space for comment.
 
The survey cards were mailed to the affected residents on Starwick Drive (35) and Traver Street (21).  The following table summarizes the survey results.
 
PROJECT AREA        # MAILED    RESPONDED     SATISFIED    DISSATISFIED
Starwick Drive
 Barton to Pontiac           35      16(+2*)          15           1
Traver Street
 Pear to John A Woods   21       9(+2*)            5           4**
 
Average %
Starwick                        100%          93.8           6.2
Traver                           100%          55.6          44.4
 
*2 letters returned due to being vacant
**1 postcard returned without checking satisfied or not satisfied but comments allude to not satisfied
 
For more information, please find the Attachment A, which includes all the comments provided by the area residents.
Staff
Prepared by:   Homayoon Pirooz, P.E., Project Management Unit Manager
Reviewed by:  Sue F. McCormick, Public Services Administrator
Approved by:  Roger W. Fraser, City Administrator