File #: 09-1078    Version: 1 Name: 11/16/09 Tim Hortons
Type: Resolution/Public Hearing Status: Passed
File created: 11/16/2009 In control: City Council
On agenda: 11/16/2009 Final action: 11/16/2009
Enactment date: 11/16/2009 Enactment #: R-09-462
Title: Resolution to Approve Tim Horton’s Site Plan, South Side of Washtenaw Avenue, West of Huron Parkway (CPC Recommendation: Approval - 8 Yeas and 1 Nay)
Attachments: 1. Tim Hortons 1-6-09 Staff Report.pdf, 2. Tim Hortons 1-6-09 CPC Minutes.pdf, 3. Tim Hortons 5-20-08 Staff Report.pdf, 4. Tim Hortons 5-20-08 CPC Minutes.pdf, 5. Tim Hortons Site Plan Reduction.pdf
Title
Resolution to Approve Tim Horton’s Site Plan, South Side of Washtenaw Avenue, West of Huron Parkway (CPC Recommendation: Approval - 8 Yeas and 1 Nay)
Memorandum
Attached is a resolution to approve the Tim Horton’s Site Plan. Approval of this resolution will allow for the construction of a 4,507- square foot gas station convenience store and drive-thru restaurant with 18 parking spaces built in one phase.

The City Planning Commission, at its meeting of January 6, 2009, recommended approval of this request.

Petition Summary:

? The Site Plan proposes demolition of the existing 2,340-square foot building and construction of a new 4,507-square foot, one-story building containing both a convenience store and drive-thru restaurant. The parking lot and gas pumps are reconfigured to accommodate 18 parking spaces and 5 pump stations.

? No impacts are proposed to natural features. 100-year storm water detention is provided underground on the northern portion of this site.

? The petitioner addressed Planning Commission’s concerns from the January 6, 2009 meeting by modifying the site plan in the following ways, as shown on the attached revised drawings:

o Moving the proposed 8-foot wide sidewalk along Washtenaw Avenue 14 feet south to keep pedestrian traffic away from the street.
o Adding a sidewalk at the corner of Washtenaw Avenue and Huron Parkway to enter the site.
o Providing additional landscaping and a berm between the sidewalk and Washtenaw Avenue to match the existing sidewalk layout north of this site.
o Modifying the entrance drive from Washtenaw Avenue. This new drive will only allow for right turns into and right turns out of the site.

Attachments: January 06, 2009 Planning Staff Report
January 06, 2009 Planning Commission Minutes (excerpt)
May 20, 2008 Planning Staff Report
May 20, 2008, Planning Commission Minutes (excerpt)
Site Plan Reduction
...

Click here for full text