File #: 19-0785    Version: 1 Name: 5/20/19 - Agreement with CenturyLink Communications, LLC, for the Allen Creek Railroad Berm Opening Project
Type: Resolution Status: Passed
File created: 5/20/2019 In control: City Council
On agenda: 5/20/2019 Final action: 5/20/2019
Enactment date: 5/20/2019 Enactment #: R-19-223
Title: Resolution to Approve an Agreement with CenturyLink Communications, LLC (CenturyLink) for up to $35,000.00 for Relocation of Fiber Optic Lines for the Allen Creek Railroad Berm Opening Project
Attachments: 1. site_plan_010419.pdf, 2. Relocations Agreement - RELO CTL LH GL70241 MI - Unsigned.pdf
Title
Resolution to Approve an Agreement with CenturyLink Communications, LLC (CenturyLink) for up to $35,000.00 for Relocation of Fiber Optic Lines for the Allen Creek Railroad Berm Opening Project
Memorandum
Attached for your review and consideration for approval is a resolution authorizing an agreement with CenturyLink Communications, LLC (CenturyLink) for up to $35,000.00 for the relocation of fiber optic lines for the Allen Creek Railroad Berm Opening Project. This agreement includes an advance payment of $31,723.71, reflecting estimated relocation costs. This resolution also authorizes a recommended contingency of up to $3,276.29. The City will only be responsible for actual costs and any funds remaining will be returned to the City.

The railroad berm near the mouth of Allen Creek in the vicinity of Depot Street and Main Street, just west of the Ann Arbor Amtrak Station, is oriented perpendicular to the overland drainage flow pattern and causes the floodplain depth in this area of the City to be as deep as 10 feet during heavy storm events. Upstream of the influence of this berm, flood depths are more typically in the 3 to 5 foot range.
In addition, there is a known trespassing hazard near the project. The lack of a convenient and reasonable pedestrian access linking the downtown area to the B2B Trail leads to the dangerous and illegal trespassing behavior. This hazard will be eliminated with a pedestrian crossing to be installed under the railroad tracks.
The project will install three large culverts beneath the railroad, one pedestrian and two stormwater culverts. The stormwater culverts will reduce the floodplain elevation and the pedestrian crossing will provide safe and legal access to the B2B trail from the population center.
Construction is expected to begin in the summer of 2019.
In order to construct the two stormwater culverts and the pedestrian tunnel, the fiber optic lines owned and operated by CenturyLink Communications, LLC must be reloca...