File #: 18-0016    Version: 2 Name: 2/5/18 - ITB 4467 Barton Dam Hydroturbine Inspection and Overhaul - Kiser Hydro LLC
Type: Resolution Status: Passed
File created: 2/5/2018 In control: City Council
On agenda: 2/5/2018 Final action: 2/5/2018
Enactment date: 2/5/2018 Enactment #: R-18-034
Title: Resolution to Approve a Contract with Kiser Hydro LLC for, for Barton Dam Hydroturbine: 10-year Inspection and Overhaul - ITB #4467 ($542,858.00)
Attachments: 1. ITB_4467_BidTab.pdf, 2. ITB_4467_Barton Turbine Overhaul_Contract_Jan2018.pdf, 3. compliance forms_separate.pdf
Title
Resolution to Approve a Contract with Kiser Hydro LLC for, for Barton Dam Hydroturbine: 10-year Inspection and Overhaul - ITB #4467 ($542,858.00)
Memorandum
This memorandum and resolution requests approval to award a contract to Kiser Hydro LLC (Kiser) for the Barton Dam Hydroturbine: 10-year Inspection and Overhaul - ITB #4467 ($542,858.00).

Barton Dam is one of the two hydroelectric power generating facilities owned by the City of Ann Arbor (City). The Facility's turbine generates approximately 4,200 MWh/year and typically contributes revenue of over $300,000.00 to the City per year. The Barton hydroturbine is the critical component to Barton Dam Hydroelectric facility and recommended operation and maintenance (O&M) practices call for rebuilding the turbine every 10 years. The last rebuild of the Barton Dam hydroturbine was in 2005 and the equipment is therefore overdue for this work.

The scope of this project includes a detailed equipment inspection and turbine equipment overhaul consisting of disassembly, removal, rebuilding and reinstalling existing turbine parts, replacement of various mechanical components, and all related work. Critical components of the work include overhaul of the generator, rebuilding of the gearbox, replacing runner and deep sea bearings, repairing wicket gates and actuators, start-up, testing and commissioning.

On January 24, 2017, the City received the following three (3) bids for this work:

Bidder
Base Bid (Items 1-8, 10)
Base Bid (Item 9)
Total Base Bid
Kiser Hydro LLC
$542,858.00
$50,000.00
$592,858.00
Hydro Consulting
$631,354.00
$50,000.00
$681,354.00
Gerace
$795,000.00
$50,000.00
$845,000.00

After evaluating the bid amounts and funding, the City has decided not to include the alternate and to forego the Item 9 allowance of $50,000.00. Since Kiser submitted the lowest responsible bid, it is recommended that their base bid, less the Item 9 allowance, for a total of $542,858.00 be accepted, and that Kiser be...