Ann Arbor logo
File #: 17-1369    Version: 1 Name: ZBA17-026; 1420 East Stadium Boulevard
Type: Resolution/Public Hearing Status: Filed
File created: 8/29/2017 In control: Zoning Board of Appeals
On agenda: 9/27/2017 Final action: 9/27/2017
Enactment date: Enactment #:
Title: ZBA17-027; 1420 East Stadium Boulevard Quatro Construction LLC, representing Circle K, are requesting a variance from Chapter 61 Section 5:502.2.b. in order for a 19 foot tall detached identification sign to remain in its current location. The sign is required to be two (2) feet behind the property line for every foot in height. A variance of 35.21 feet along Stadium Boulevard and a 31.75 foot variance along Packard Street will be required in order for the sign to complete a face change and remain at the corner of this intersection.
Attachments: 1. Staff Report for ZBA17-027 1420 E Stadium (Circle K) with Attachments .pdf

Title

ZBA17-027; 1420 East Stadium Boulevard

Quatro Construction LLC, representing Circle K, are requesting a variance from Chapter 61 Section 5:502.2.b. in order for a 19 foot tall detached identification sign to remain in its current location. The sign is required to be two (2) feet behind the property line for every foot in height. A variance of 35.21 feet along Stadium Boulevard and a 31.75 foot variance along Packard Street will be required in order for the sign to complete a face change and remain at the corner of this intersection.