Ann Arbor logo
File #: 08-0934    Version: 1 Name: 10/20/08 - Ann St. Conversion to One Way
Type: Resolution Status: Passed
File created: 10/20/2008 In control: City Council
On agenda: 10/20/2008 Final action: 10/20/2008
Enactment date: 10/20/2008 Enactment #: R-08-446
Title: Resolution to Approve the Conversion of Ann Street between 5th Ave. and Division St. to One Way (eastbound)
Attachments: 1. 2008 city hall construction parking, 2. Ann Street TCO.doc, 3. Ann St. residents letter, 4. Ann St. One Way Press Release, 5. Ann St One way Communicatin Plan, 6. Back-in parking with bike lanes study, 7. Revised Map - city hall construction parking ONSITE PARKING AND ANN STREET PARKING
Title
Resolution to Approve the Conversion of Ann Street between 5th Ave. and Division St. to One Way (eastbound)
Memorandum
Due to the construction of the Courts - Police facility commencing early 2009, public parking space at the City Hall lot will be dramatically reduced. The conversion to one way will allow for a better traffic flow and an increased number of spaces to be arranged on Ann Street during and post construction at the City lot.

The portion of Ann Street east of Division Street currently operates one way eastbound and forms a one way pair with Catherine (westbound). On Ann Street, current daily traffic volumes are estimated to be 3000 vehicles with approximately 850 vehicles westbound. Minimal impacts to operations are expected with the change due to the traffic volume and the roadway network configuration.

The current on street parking supply for Ann Street provides 28 metered parking spaces. Through the conversion and the installation of angle parking (back-in angle) eight (8) spaces can be added in conjunction with a mid block crosswalk. Back-in angle parking is proposed as it has shown safety benefits particularly regarding pedestrian and bicycle conflicts.

In concert with the change a comprehensive communication plan will be enacted. A formal press release, letters to neighboring properties, a website posting and information in the employee newsletter are elements of the plan.

Additional parking spaces are planned for Ann Street east of Division and Fifth Avenue north of Ann Street to coincide with construction activities. On-site parking will be maximized to the extent possible in the space not needed for the contractor’s operations throughout the project timeline.

Staff
Prepared by: Homayon Pirooz, P.E., Project Management Mananger
Reviewed by: Sue F. McCormick, Public Services Administrator
Approved by: Roger W. Fraser, City Administrator
Body
Whereas, The Courts-Police building construction will drastically r...

Click here for full text