File #: 08-0394    Version: 1 Name: 050508 - CMA and URS Airport Agreements for Box Hangars
Type: Resolution Status: Passed
File created: 5/5/2008 In control: City Council
On agenda: 5/5/2008 Final action: 5/5/2008
Enactment date: 5/5/2008 Enactment #: R-08-199
Title: Resolution to Approve an Agreement with CMA Construction Services Inc. ($2,390,000.00), Approve Contract Amendments #1 and #2 to the Professional Services Agreement between the City and URS Corporation ($38,000.00) and Appropriate Funds and Amend the Project Budget for the Box Hangar and Snow Removal Equipment Building Project at the Ann Arbor Airport ($2,566,374.00) (8 Votes Required)
Attachments: 1. Airport Contract Amendment #1.pdf
Title
Resolution to Approve an Agreement with CMA Construction Services Inc. ($2,390,000.00), Approve Contract Amendments #1 and #2 to the Professional Services Agreement between the City and URS Corporation ($38,000.00) and Appropriate Funds and Amend the Project Budget for the Box Hangar and Snow Removal Equipment Building Project at the Ann Arbor Airport ($2,566,374.00) (8 Votes Required)
Memorandum
Approve an Agreement with CMA Construction Services Inc.

Attached for your review and approval, please find a resolution that approves an agreement between the City and CMA Construction Services Inc. for the construction of six box hangars and a snow removal equipment (SRE) building at the Ann Arbor Airport. The two projects were combined into one bid document and will be awarded to one contractor. These improvements were included on the Airport Layout Plan approved by City Council in January, 2007. The projects were originally bid last fall but prices came in too high and bids were rejected. The projects were redesigned, reduced in scope and eleven bids (see attached bid tabulation sheet) were received on the February 19th re-bidding.

Snow Removal Equipment Building: The existing vehicle storage and maintenance building is an old pole type structure that is partially heated and has no running water or sewers. This is the only facility that we currently have at the Airport to store and maintain our vehicles and equipment. The building will be retained after construction of the new SRE building to store off season equipment and materials. The heat will be shut off to minimize operational expenses. The new SRE building will be a 7,700 square foot structure that will provide office space for the airport maintenance staff, a vehicle repair bay and a vehicle storage area for in-season equipment. The need to retain the old building for storage is even more significant because of the 30% reduction in the size of the new building as a result of the redesign. ...