Ann Arbor logo
File #: 15-0410    Version: 1 Name: 4/20/15 Resolution to Accept Easement for Public Utilities at 982 Broadway from DTE Electric Company
Type: Resolution Status: Passed
File created: 4/20/2015 In control: City Council
On agenda: 4/20/2015 Final action: 4/20/2015
Enactment date: 4/20/2015 Enactment #: R-15-142
Title: Resolution to Release a Portion of Existing Water Main Easement and Accept in its Place a New Easement for Public Utilities at 982 Broadway from DTE Electric Company (8 Votes Required)
Attachments: 1. 982 Broadway Water Easement Drawing
Title
Resolution to Release a Portion of Existing Water Main Easement and Accept in its Place a New Easement for Public Utilities at 982 Broadway from DTE Electric Company (8 Votes Required)
Memorandum
In 2000, City Council accepted a grant of easement from DTE for water main and sanitary sewer at 982 Broadway. City staff determined that a new easement was necessary to extend the existing water main. The new public utilties easement is intended to supersede and replace the water main portion of the prior easement. The sanitary sewer portion of the prior easement will remain in place.

This easement is in standard form and is conveyed without cost to the City.

Release of the water main portion of the existing easement and acceptance of the new public utilities easement is recommended.
Staff
Prepared by: Alexandria L. Hammett, Legal Assistant
Reviewed by: Christopher Frost, Assistant City Attorney
Approved by: Steven D. Powers, City Administrator
Body
Whereas, In 2000, The Detroit Edison Company granted to the City an easement for sanitary sewer and water main at 982 Broadway, recorded at Liber 3927, Page 128 of Deeds, Washtenaw County Records;

Whereas, DTE Electric Company, formerly known as The Detroit Edison Company, is the owner of property commonly known as The Buckler Center, 982 Broadway, Ann Arbor, Michigan 48105, described at Liber 4365, Page 237 of Deeds, Washtenaw County Records; and

Whereas, In order to replace a portion of the existing easement, DTE Electric Company has signed a new grant of easement for public utilities, described as:

Commencing at the intersection of the centerline of Broadway Street (100 feet wide) and the centerline of vacated Canal Street (30 feet wide); thence South 58?32'16" East, 255.03 feet, along the centerline of vacated Canal Street (30 feet wide); thence South 28?33'34" West, 78.57 feet, along the westerly line of an Alley 25 feet wide; thence along the Southwesterly line of Canal Street, on...

Click here for full text