Title: Resolution to Award a Construction Contract to Lanzo Companies, Inc. ($2,338,237.00, Bid No. ITB-4643) for the 2020 Sewer Lining Project
Attachments: 1. BidTab.pdf, 2. ITB_4643 2020 Sewer Lining project - Lanzo.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Title
Resolution to Award a Construction Contract to Lanzo Companies, Inc. ($2,338,237.00, Bid No. ITB-4643) for the 2020 Sewer Lining Project
Memorandum
Attached for your review and approval is a resolution to award a contract to Lanzo Companies, Inc., in the amount of $2,338,237.00, for the 2020 Sewer Lining Project.

This project includes lining approximately 31,000 feet of sanitary and storm sewer at multiple locations throughout the City, as well as contingencies to repair or maintain segments of pipe where lining is not feasible. In addition, the project will line 50 sanitary sewer manholes to aid in limiting stormwater infiltration into the sanitary sewer system. Those locations are combined into one contract for efficiency and cost savings. The project locations were identified by City staff as in critical need of repair.

Lining is a "trenchless" technology that enables pipe repair or maintenance without disturbing the surface above. During lining, new material is pumped into the existing pipe, creating a new pipe inside the existing one. The process is not only cost effective but eliminates the need for extensive excavation and lengthy traffic control measures, thereby minimizing traffic disruption. The project is expected to begin in January 2021.

In response to the Invitation to Bid (ITB-4643), four (4) bids were received on October 13, 2020. The low bid from Lanzo Companies, Inc. of $3,582,585.00 is approximately $1,000,000.00 over the Engineer's Estimate. Although the Engineer's Estimate was based on recent bid prices, it did not include a number of factors specific to this project, such as the location of portions of the project in the downtown area and the requirement that the project utilize styrene-free liner material. In addition, access to portions of the sewer and flow control will require additional work by the contractor.

The amount budgeted to this project from the Stormwater Fund was inadequate to cover the entire amount of storm ...