File #: 18-0563    Version: 1 Name: 5/7/18 - Federal Commerce Green Sidewalk (City - State Agreement)
Type: Resolution Status: Passed
File created: 5/7/2018 In control: City Council
On agenda: 5/7/2018 Final action: 5/7/2018
Enactment date: 5/7/2018 Enactment #: R-18-157
Title: Resolution to Approve a Contract with the Michigan Department of Transportation for the Federal Commerce Green Sidewalk Gap Project ($250,000.00)

Title

Resolution to Approve a Contract with the Michigan Department of Transportation for the Federal Commerce Green Sidewalk Gap Project ($250,000.00)

Memorandum

Attached for your review and consideration, please find a resolution to approve a contract between the City of Ann Arbor and the Michigan Department of Transportation (MDOT) for the construction phase of the Federal Commerce Green Sidewalk Gap Project.  The agreement prescribes the cost sharing of the construction, as well as each party’s rights and responsibilities, and is required for the project to receive its share of federal funding from the Surface Transportation Program (STP).

 

In accordance with the City’s Non-Motorized Plan and Complete Streets approach, the City proposes installing a new sidewalk to close gaps and provide a continuous pedestrian connection along the north side of Federal / Commerce Drives between Stadium and 2030 Commerce Drive, and along the west side of Green Road from Burbank Drive to Gettysburg Road.

 

Sidewalk construction is expected to begin on or after August 20, 2018 and be completed by November 1, 2018.

 

The City submitted completed plans to MDOT in January of 2018, and the project was advertised in February for an April 6, 2018 MDOT bid letting.  This memorandum and resolution were prepared prior to the letting date, so bids were not available.  MDOT will award a contract to the qualified low bidder and administer the contract.  The City will act as the project engineer.  Further information on the history of this project can be found on the project web page at: <https://www.a2gov.org/departments/engineering/Pages/Federal-Blvd-and-Commerce-Dr-Sidewalk-Gap-Project.aspx>.

 

Budget/Fiscal Impact

 

The Engineer’s estimate for the project’s construction is $391,226.50. The estimated total cost of the project is $577,000. In total, the City will be receiving approximately $250,000 in Federal funds for this project.  The federal funding will be used to fund participating construction expenses.  The City will be funding its share of the construction costs and the design, construction engineering, and material testing costs.  Funding for this project will also include special assessments. 

 

 

A breakdown of the project revenues are shown below:

 

Federal Surface Transportation Funds

$250,000.00

Street, Bridge, and Sidewalk Millage

$277,000.00

Special Assessment

$50,000.00

TOTAL REVENUE

$ 577,000.00

Staff

Prepared by:  Nicholas Hutchinson, P.E., City Engineer

Reviewed by:  Craig Hupy, Public Services Area Administrator

Approved by:  Howard Lazarus, City Administrator

Body

Whereas, Funding for this project will be paid by Special Assessment and the Street, Bridge, and Sidewalk Millage;

 

Whereas, The City of Ann Arbor will receive Federal funding from the Surface Transportation Program (STP); and

 

Whereas, It is necessary to approve the cost sharing agreement with the Michigan Department of Transportation so that the project can proceed.

 

RESOLVED, That the Mayor and City Clerk be authorized and directed to execute Michigan Department of Transportation Contract No.18-5097 for the Federal Commerce Green Sidewalk Gap Project, substantially in the form on file with the City Clerk, following approval as to substance by the City Administrator, and approval as to form by the City Attorney; and

 

RESOLVED, That the City Administrator be authorized to take the necessary administrative actions to implement this resolution including approval of needed Traffic Control Orders, night work authorizations, and other similar administrative approvals to allow the work of the project to proceed without delay.